Boomilever
Hold 15 kg of sand with the chain 40 to 45 cm out from a wall, using as little wood as possible. This build lab walks you around the loop that gets you there: design it, build it precisely, test it until it breaks, write down what happened, and make the next one lighter.
New for 2027
2027 overview
What changed from the 2026 rules, what it does to the boomilever, and how we get to a new design.
The lab
Work through the five phases in order. Mark each sheet done as you finish it.
Tools
The calculators and explorers from the sheets, one tap away.
Reference
Look up the rules that shape your design and how to set up a test.